In early September, a stretch of Hilchey Road showed only faint shadows where the bike lanes and road markings used to be. The Campbell River Mirror ran a photo of exactly that and described Hilchey as "one of Willow Point's busiest roads."
The parking-protected lanes went in during 2022 as part of a watermain upgrade, and they are now being removed. The bigger change is where the cycling route goes next. Most of it now runs along a chain of quieter streets a few blocks away and comes out on the waterfront at Simms Road. Hilchey keeps a short two-way path at its western end. Further east, it goes back to being a road for driving and curbside parking.
Council asked for a full safety review of the corridor in early 2026 after ongoing resident concerns. McElhanney Ltd. did the work. Matthew Browning of McElhanney told Council, as reported by the Campbell River Mirror, that "there isn't a particular design decision that is making things unsafe. It's more systemic than that."
The review described the layout's two main problems in its own words:
The configuration created a "disconnect between driver expectations of uninterrupted travel and the frequent yielding necessitated by the existing roadway configuration," and the painted buffer zones were "routinely encroached upon by parked vehicles … These behaviors were documented during standard daytime conditions and appear to reflect typical usage rather than isolated instances of noncompliance."
The report also raised safety concerns around Penfield Elementary School. Riders had to cross a busy road where drivers expected to keep moving, so the City is moving most of the riding onto streets where that conflict is smaller.
The staff report said the neighborhood bikeway "is deemed to better address systemic safety issues on Hilchey Road, improve cycling comfort, and addresses some of the concerns raised by Penfield School officials."
This is how the Mirror's June report laid out the new route, heading east:
On Penfield, Parkway and Simms, the Mirror reported that the plan calls for 30 km/h speed limits and traffic calming. There won't be painted bike lanes, and on-street parking isn't affected. The City's project page lists the physical work on these streets as lowered curbs, called letdowns, plus signage and pavement markings. It calls the result a shared neighborhood bikeway.
If you live on Parkway, South Alder or Simms, expect more bikes going past your driveway and new stencils on the road. Parking stays as it is. If you live on Hilchey east of Penfield, the painted lanes, centre lines and other markings between South Dogwood Street and the South Island Highway had already been removed by September 4.
Simms Road reaches the South Island Highway at the waterfront. The City lists Simms Park at 145 Simms Rd. BC Nature names the Simms Creek estuary as one of the main access points to the Rotary Seawalk. It describes the Seawalk as a shoreline route from Ocean Grove toward the town center, with 6.5 km of paved trail to Hidden Harbour and then about 2 km of sidewalk into the center.
Under the old layout, a rider in the Penfield or Parkway area aiming for the water rode Hilchey down to the highway. Under the new one, the same trip runs along residential streets with a lower speed limit and ends at a creek estuary and a paved Seawalk access point.
At the other end, the City's cycling page lists separated multi-use paths on South Dogwood Street and along the SeaWalk. The new Hilchey path ends at South Dogwood. Once both are built, the network links South Dogwood's path to the Seawalk at Simms Park through a mix of a separated path and shared streets.
With the bike lanes gone, the City's plan restores on-street curbside parking on Hilchey and widens the vehicle lanes. The paved two-way cycling path runs beside the existing sidewalk from Penfield Road to South Dogwood Street. The City's published rendering is marked for illustration only and may not match the final build.
Flashing pedestrian lights are also planned for the crosswalk at Hilchey and Fern Drive. If you walk to the shops or a bus stop across Hilchey, that's probably the change you'll notice most, though no source we've seen has confirmed the lights are installed yet.
The order of the work matters if you use the corridor every day. The City scheduled the neighborhood bikeway and the removal of the old lanes first. The new Hilchey path is the last step.
| Piece of the project | Status in the latest published updates |
|---|---|
| Old 2022 bike lanes on Hilchey | Removed in late August |
| Markings from South Dogwood St. to South Island Hwy | Removed as of Sept. 4 |
| 30 km/h zone near Penfield Elementary | In place for the 2026/2027 school year |
| Two-way path in front of Penfield Elementary | Finished before school started |
| Sidewalk and two-way path at Alder St. and Parkway Rd. | Installed as of Sept. 4 |
| Curb letdowns at College Dr. and Parkway Rd. | Added as of Sept. 4 |
| Full Hilchey path, Penfield Rd. to South Dogwood St. | Scheduled for "later in fall 2026" |
| Flashing lights at Fern Drive crosswalk | Planned, with no installation reported yet |
The original goal in June was to finish before fall. By September the schedule had moved. City communications and engagement specialist Rebecca Szulhan told the Mirror that construction "is currently underway and will continue throughout the fall." The City still expects to finish the whole project in fall 2026. As of mid-October, we haven't found a published update since September 11, so expect more lane work on Hilchey's western stretch before the season ends.
Council set aside $750,000 for the work. The money comes from existing 2026 cycling infrastructure funds, including the Community Works Fund and the Carbon Neutral Reserve. City meeting highlights from June 9 and 11 record the 2026 cycling infrastructure budget being raised to $750,000, with $236,333 of that total coming from the Carbon Neutral Reserve.
The stakes were plain when Council discussed it. Coun. Sean Smythe pointed out that the current Hilchey layout had also been designed by a transportation consultant. "This makes your position even harder, because we're doubling down on the same faith. We need this to work," he said, as quoted in the Mirror. Browning said he "wouldn't put something forward that I wouldn't be comfortable using."
The project isn't the last word on the stretch outside Penfield Elementary. Council also told staff to update the Master Transportation Plan to include a "Penfield School Zone Warrant Assessment" as a short-term priority, which will look at further safety improvements on Hilchey near the school. More changes in front of the school could come out of that review after this fall's work wraps up.
The City posts closures and lane work at campbellriver.ca/news/traffic-updates, and you can sign up for email alerts at campbellriver.ca/subscribe. For project questions, contact the Dogwood Operations Centre at [email protected] or 250-286-4033.
Changes to street parking, traffic speeds and the route to the Seawalk can shape how a Willow Point street feels day to day. If you live along Hilchey, Penfield, Parkway, South Alder or Simms and want to know where your home stands, Sophie Gardner Home Team can walk you through it. Get your free home valuation.
Stay up to date on the latest real estate trends.
No matter your need, whether you are a first time home buyer, looking to sell, or a seasoned property investor, contact us to see how we can help with your goals.